Location: London

Sector: Leisure

Over a 4 year period, we installed approx 30,000m² of Mastertop 1324 to the floors at the Olympia Exhibition venue.

BASF Mastertop 1324 was chosen as it was the only product able to be installed directly over the existing asphalt surface.

It also had to be hard wearing to endure all the heavy loads and foot traffic this venue receives.

A slip resistant version was installed in the loading docks and some 2000 access covers had to be resurfaced.

Each area had to be completed within a strict time frame between exhibitions, which we successfully achieved.